Asa 美世国际 中学 Replacement Project

项目简介

The existing Asa 美世 中学 building will be demolished and a new mass timber multi-story middle school building of approximately 174,000 sq. ft. 构造. Once complete, the new school building will provide permanent space for 1,000 students in grades 6–8.

The new one- to three-story school will be surrounded by landscaping and outdoor learning spaces. A synthetic turf practice field is planned for the east side of campus. 一个新的, 安全入口将欢迎学生, 家庭, and the community with a clearly defined “front door” to the school.

Classrooms will be organized by academic neighborhoods, with flexible support spaces to promote a sense of community and support academic success for all students.

Sustainable design features are built in to meet district goals for clean energy and renewable resources.

资金来源: Funded by the Building Excellence V (BEX V) Capital Levy, approved by Seattle voters in 2019.

临时地点: 在施工期间, 美世国际 中学 will be located at the Van Asselt School Interim Site, 灯塔大道7201号. S.

时间轴

construction phase graphic showing that the school is in the Construction phase
了解在这些阶段会发生什么
  • 设计阶段
  • 方案设计阶段
  • 设计开发阶段
  • 施工文件/许可阶段
  • 正在进行的建设阶段
  • 学校于2025年秋季开学

当前的设计

This site plan below shows the planned layout for the campus and new school building. 北是在图像的顶部. 西界在第16大道南. 在左边. S. 哥伦比亚之路在底部.

site plan for a large space with a building, trees, and parking
drawing of the corner of a 3 story building with stairs leading to it
Design view of looking toward the entry from corner of S. 哥伦比亚路和第16大道. S
drawing of a courtyard in the corner of two parts of a 2 story and 3 story building
Architects’ drawing of courtyard outside of classroom building
a large open 2 story interior space looking down over learning stairs to the floor with lunchtables
建筑师绘制的公地图
2 rooms with green walls have windows looking out to a common area with a pillar in it
两个教室之间的学习共享

项目进展

项目视频直播

照片

a steel interior stairway inext two a framed in wall on one side and large laminate beams on the other side
Steel stair installed along side the gymnasium – May 2024
exterior of a partially built wing of a building withe a roof and construction equipment
图书馆屋顶和护墙——2024年5月
a large open space with laminated timber beams and wall supports and cross laminated decking
Cross-laminated timber decking in the classroom area – May 2024
a large room under construction with metal framed walls and wood framed ceiling with piping
Looking northwest in the new band room – May 2024
a building under construction with steel truss being installed for the roof and some wood wall framing in place
Steel truss erection for the gymnasium roof – Apr. 2024
a row of frames made of columns and beams with steel on the ground in front
胶合木柱和梁安装- 4月. 2024
a crane is lowering a large sheet of wood onto a wood frame of a building under construction
Cross-Laminated Timber (CLT) installation for the corridor – Apr. 2024
a partially framed building has a wood ceiling resting on wood beams and posts
Looking along the corridor spine on the 2nd floor – Apr. 2024
钢结构围绕着框架
Learning stairs support steel structure installation – Apr. 2024
a building is under construction with large cross-laminated timber beams and tibler posts
木框架安装- 3月. 2024
正在建造的建筑物的木框架
南区的框架,他们
一座建筑物正在用木头搭建起来
Timber frame with cross-laminated timber in the entry area – Mar. 2024
挖掘机在建筑工地铲土
Backfilling and compacting soil at the location of the classroom building – Feb. 2024
a concrete pump truck in the background with workers and a concrete slab in the foreground
为主入口浇筑钢梁- 2月. 2024
aerial view of a construction site that is still mostly flat and has some equipment on it
2月1日- 2月1日从网络摄像头向西南看. 2024
a trench with multiple lines of electrical conduit in it
Underground electrical new future boiler room – Nov. 2023
有大管子的沟渠
地下水管-十一月. 2023
a large construction machine is on a field of soil that has large round holes in it
钻孔集料墩- 10月. 2023
a tall metal structure is attached to the back of a truck with part of it in the ground. 两个工人在它旁边.
钻地热井- 10月. 2023
a large expanse of soil with construction vehicles. 背景中有常青树.
向南- 10月. 2023
挖土机在挖洞
Installing deep stormwater and sanitary sewer – Sept. 2023
a construction site with construction equipment and trees
Demolition of former school building now complete – Sept. 2023
an expanse of concrete leads to two partially demolished buildings - one on each side - each has an excavator doing demolition
View of the demolition from the old parking lot – August 2023
部分拆毁的建筑物 that is part brick. 砖的部分保留了下来
Demolition of the east wing of the old building – August 2023
部分拆毁的建筑物. the remaining part of the building is two stories with a series of arched roofs
Demolition of the west wing of the old school – August 2023

建设更新

Project updates are posted for the previous month.

2024年5月- 6月

A topping off ceremony on May 31 celebrated completion of the structural elements. Work is underway on roofing and masonry on the exterior. Inside, work continues on utility rough-in and interior walls.

项目团队

施工管理: shels Obletz Johnsen公司. (SOJ)

SOJ施工经理: 贾丝廷金, justinek@sojsea.com, 206-838-3706

学校的设计: Bassetti建筑师

总承包商: 基石总承建商

项目地址

1600 S. 哥伦比亚路,西雅图,华盛顿州98108